They design, develop and manufacture drug delivery devices, like inhalers and nasal technologies for some of the world’s largest pharmaceutical companies.
We were chosen for this project because of the work we’ve done previously with Bespak – and because we’re competitive on price. Our programming had to be super thorough as we were working alongside the main contractor during the installation works. This was no problem though, it’s something we do all the time.
We’re flexible – so when things change like the scope of works or when additional works are added, we do our best to accommodate them. Managing the different trades and MEWPS on site, was a task at times, so we made sure that any works that overlapped were all well-managed – including that all important health and safety.
Installing a 1400m² resin flooring system in their main production area, in King’s Lynn
Remmers – which we’d used on previous installations over the years. We used Remmers BS3000 water base coating, Resuscreed 45 for the coving application and Pumexpand for the expansion joints.
Diamond Grind
We completed the work over three phases over a three-week period.